Current Projects
| School Name | Project Description | Start Date | Completion Date or Anticipated Date | Percent Complete |
|---|---|---|---|---|
| St. Pius | Full Classroom Renovation: flooring, lighting, and technology upgrades | 05/01/2024 | 08/31/2024 | 100% |
| St. Margaret | Full Classroom Renovation: flooring, lighting, and technology upgrades | 05/01/2024 | 08/31/2024 | 100% |
| St. Jude | Full Classroom Renovation: flooring, lighting, and technology upgrades | 05/01/2024 | 08/31/2024 | 100% |
| St. Patrick | 2nd Floor Science Room Renovation: new lab stations and equipment | 05/01/2024 | 08/31/2024 | 60% |
| St. Patrick | Main Floor Classroom Renovation: modernized classroom layouts and features | 05/01/2024 | 08/31/2024 | 60% |
| St. Jude | Gymnasium Renovation | 05/01/2024 | 08/31/2024 | 100% |
| St. Vincent | Ventilation System Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Paul | HVAC and Ductwork Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Bernard | Boiler Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Ignatius | Exterior Façade Renovation – Phase 2 (New Insulation, Siding, Windows) | 05/01/2024 | 08/31/2024 | 100% |
| Holy Cross | Walkway Construction | 05/01/2024 | 08/31/2024 | 100% |
| Corpus Christi | Full PA System Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Elizabeth | Full PA System Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Ignatius | Full PA System Replacement | 05/01/2024 | 08/31/2024 | 100% |
| Bishop Gallagher | Full Window Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Francis | Full Window Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Vincent | Full Window Replacement | 05/01/2024 | 08/31/2024 | 100% |
| St. Bernard | Full Exterior Door Replacement | 05/01/2024 | 08/31/2024 | 50% |
| St. Ann | Full Exterior Door Replacement | 05/01/2024 | 08/31/2024 | 50% |
| Holy Cross | Full Exterior Door Replacement | 05/01/2024 | 08/31/2024 | 50% |
| Corpus Christi | Outdoor Renovation | 05/01/2024 | 08/31/2024 | 75% |
| Our Lady of Charity | Outdoor Area Renovation | 05/01/2024 | 08/31/2024 | 75% |
| St. Patrick | Art Room Renovation | 05/01/2024 | 08/31/2024 | 100% |
| Our Lady of Charity | Sprinkler System Installation | 05/01/2024 | 08/31/2024 | 100% |
| St. Bernard | Asphalt Repaving | 05/01/2024 | 08/31/2024 | 100% |
| Holy Family | Asphalt Repaving | 05/01/2024 | 08/31/2024 | 100% |
New Projects
| School Name | Project Description | Start Date | Completion Date or Anticipated Date | Percent Complete |
|---|---|---|---|---|
| St. Patrick | Exterior Windows | 05/01/2025 | 08/31/2025 | 0% |
| St Ignatius | Phase 3 -Exterior Façade Renovation | 05/01/2025 | 08/31/2025 | 0% |
| St. Ignatius | Phase 3 – Exterior Paneling and Windows including addition of advanced security doors and electronic access control. | 05/01/2025 | 08/31/2025 | 0% |
| St. Patrick | Upgrading Front Windows and Doors for improved insulation, security, and aesthetics. | 05/01/2025 | 08/31/2025 | 0% |
| Corpus Christi, St. Pius, St. Thomas | Replacement of Exterior Doors to improve security, energy efficiency, and ease of access. | 05/01/2025 | 08/31/2025 | 0% |
| St. Ann, St. Margaret, Bishop Gallagher | Installation of advanced Public Address (PA) Systems to enhance internal communication and emergency response. | 05/01/2025 | 08/31/2025 | 0% |
| Bishop Gallagher, St. Elizabeth, St. Ignatius, St. Ann, EQ | Comprehensive Classroom Renovations including updated lighting, flooring, paint, and technology integration. | 05/01/2025 | 08/31/2025 | 0% |
| St. Patrick, St. Ignatius, St. Pius X, St. Bernard, Corpus Christi, Holy Cross | Complete Fire Alarm System upgrades to enhance safety and meet current fire safety standards. | 05/01/2025 | 08/31/2025 | 0% |
| St. Jude, OLOC, Bishop Gallagher, St. Thomas, St. Elizabeth | Exterior Window Replacement to increase energy efficiency, natural lighting, and building aesthetics. | 05/01/2025 | 08/31/2025 | 0% |
| St. Patrick, St. Ignatius | Grade 9 Technology Rooms modernization to support advanced education and technology curriculum. | 05/01/2025 | 08/31/2025 | 0% |
| OLOC, Corpus Christi | Modernization of Front Entrances to enhance accessibility, security, and welcoming appearance. | 05/01/2025 | 08/31/2025 | 0% |
| St. Vincent | Resurfacing of Asphalt areas for improved safety, accessibility, and aesthetic appeal. | 05/01/2025 | 08/31/2025 | 0% |
| Holy Cross | Repair and improvement of school walkway infrastructure for enhanced safety and accessibility. | 05/01/2025 | 08/31/2025 | 0% |
| St. Jude, PJP | Installation of perimeter fencing to enhance security and define school boundaries. | 05/01/2025 | 08/31/2025 | 0% |
| St. Paul, Holy Family | Gym Floor replacements to improve safety, performance, and aesthetics for athletic activities. | 05/01/2025 | 08/31/2025 | 0% |
| St. Jude, St. Pius, St. Martin | Installation of artificial Turf to provide durable, all-weather outdoor recreational spaces. | 05/01/2025 | 08/31/2025 | 0% |
| St. Francis, St. Vincent | Creation of Outdoor Learning and Play Spaces tailored specifically for JK/SK students. | 05/01/2025 | 08/31/2025 | 0% |
| St. Vincent | Complete renovation of Washrooms across two floors, including plumbing, fixtures, flooring, and ceiling upgrades. | 05/01/2025 | 08/31/2025 | 0% |